RMS-AAPG: Water Management Tour

**Offered as part of the 2026 Annual RMS-AAPG Annual Conference
After visiting Montana Resources permitted copper and molybdenum mine and concentrator in the morning, we will turn to the Superfund cleanup of legacy mining from a perch overlooking the Berkeley Pit, the Continental Pit, the concentrator and the 700+ foot high Yankee Doodle Tailings impoundment after lunch, from 1 – 3 pm.
The origins of the ore and subsequent contamination for the entire Superfund complex, including the Anaconda Smelter and Clark Fork/Mill Town Sediments Sites, are the 10,000 miles of underground workings and the Berkeley Pit with its infamous lake. Underground mining was going full bore by the 1880s but was largely abandoned as the rich copper veins played out and open pit mining proved more economical to extract lower grade ore in the later 1950s. In 1982, Atlantic Richfield, the mine owner, turned off the pumps that kept groundwater out of the Berkeley Pit and underground workings. By 1987, when EPA established the Butte Mine Flooding Operable Unit, the Berkeley Pit had a small but rapidly rising lake that was fed by groundwater flowing through the surrounding underground mine workings. The EPA determined that cleaning up contamination in the rising water would be technically impracticable, but that the contamination could be managed by keeping water levels below an elevation that would contain it within the mining area, a “protective water level” at 5410 feet above sea level. Water levels are currently being maintained well below that mark by pumping and treating and then releasing the treated water into Silver Bow Creek. A working group of local, state and federal personnel, plus local citizens, has created an informative website called Pitwatch (https://pitwatch.org/learn/water-treatment/).
Questions? Contact 2026 RMS-AAPG field trip co-chairs Mary Bitney and Jake Thacker (rmsaapgmeeting@gmail.com)
